 |
Q. How
do I determine if I need a permit?
Most major projects or developments will require the issuance
of a permit. Permits are a form of insurance for the property
owner and others to ensure that applicable codes are enforced.
Contact the Department if you are not sure.
TOP OF PAGE
Q. How do I apply for a permit?
Building permits are accepted over the counter or by mail. This
is to ensure that all necessary information and documentation
is submitted therewith.
TOP OF PAGE
Q. Do I need to schedule an appointment to obtain or file
an application?
Building permit applications require no appointment, however
it is more efficient if you do call and make an appointment.
TOP OF PAGE
Q. How long should I expect the permit process to take?
Ordinarily it takes 7-10 working days to obtain a permit. Please
allow for the full amount of time.
Note: Engineered drawings may exceed this time frame due to
the fact that the plans are plan checked by outside services.
TOP OF PAGE
Q. What will happen after the permit is applied for?
For a full description of the building permit process go to
Permit
Process.
TOP OF PAGE
Q. Are permits required to re-roof?Are permits required
to install or replace a water heater?
Yes, both require permits. Please see the Permit
Index.
TOP OF PAGE |
|